Tags: ‘Hardwood Flooring’

Bonus Room…or Library/Office?

Need a home office or library?  Consider using your Family Room as a gathering area, and turning your Bonus Room into a home office or library.  Many homes in Middle Tennessee come with a Bonus Room over the Garage.  Defining that room can add value to your home.  Contact me and let me help you design a space in your home to fit your lifestyle.Library_Office

Bonus Room…or Bedroom?

 

I can think of so many ways to use this great idea!  Turning a second family room or bonus room into an additional bedroom will add value to your home.  Your three bedroom home can easily become a four bedroom home.  Let me help you design something that meets the needs of your family.Attic Bedroom

Flooring…Now or Later?

Upon the completion of the sheetrock phase, installation of some of your flooring may begin.

floor-333165_1280If you select natural hardwood flooring, the wood must acclimate to the environmental conditions of your new home. Delivery of the product you selected ten days to two weeks ahead of installation is absolutely necessary. Natural wood will expand and contract with current weather conditions, more or less moisture in the home causes the wood to expand (more moisture) or contract (less moisture). Imagine the result of installing moist wood when you turn the heat on in your new home…the drying out will cause gaps between the planks. The opposite occurs if you install dry wood in your new home…the moisturizing of the planks will cause them to expand, forcing the gaps to buckle up and cause “cupping”. A number of alternatives now available in pre-finished wood flooring allow for installation at a later date, but acclimation must still be included in the process.

That brings us back to decisions, decisions, decisions! If you elect to use natural hardwood, installation takes place prior to the trim phase. Following acclimation, a subcontractor will cover the subfloor with black felt paper that acts as a moisture barrier and then staples the hardwood planks in place. Once again, the flooring needs to rest before sanding and the application of the first coat of stain and polyurethane. During the initial sanding and application of stain phase, other activities in the home are curtailed. The resumption of other activities may resume when the floors have completely dried, after a protective cover of paper is placed over them. The last coats of polyurethane are applied near the end of completion of your new home.

Ceramic TileIf you have decided to use any tile flooring in your new home, installation begins while newly delivered hardwood acclimates. The first step includes installation of cementitious board in the tile areas, including walls for showers and tub surrounds. This board creates a hard, solid surface under the tile, and insures that grout joints will not crack. The tile you selected will then be set in place with mortar, allowed to dry, and grouted. Covering finished tile floors prevents grout from becoming dirty before the application of sealer.

Carpet

The installation of carpeting and sheet linoleum occurs during the end phase of completion, but before the final coat of polyurethane on natural hardwood floors.

 

The order of the building process prevents accidental damage to floor surfaces and costly repairs. Have questions? Drop me a note, and I will be more than happy to try to help you.